Welcome to Nanjing Litong Heavy Industry Machinery Co., Ltd!


+86-15951020080
+86-025-56209366
Seawater FGD EP Contract for Indonesia Dingchang Power Plant Co., Ltd. Power Center Construction Project
GJSL-SCFJSG Section (Side Wall Loading Platform, Gallery and Steel Stair Construction) of Production and Auxiliary Building Construction for Phase I of Lianyungang International Grain Logistics Center
Nanjing Gulou International Hospital Phase II EPC Project
Flue Gas Desulfurization System and Zero-Discharge Desulfurization Wastewater System Engineering for the New Coal-Fired Subcritical Backpressure Unit Replacement and Integration Project of Jiangyin Zhoubei Thermal Power Co., Ltd.
The Flue Gas Seawater Desulfurization System Project of China Coal Daishan Yushan Power Plant
Construction Project for the Hongdao Network Operation Control Center of Qingdao Metro
Comprehensive Development and East Square Project for the New Hefei West Station of the Newly-built Hefei-Anqing Railway
High-concentration Anaerobic Digester Project of Qingpu District Bio-resource Recycling Center
High-concentration Anaerobic Digester Project for the Newly-built Fengxian District Bioenergy Recycling Center
The Project of the Newly-built Factory Building of Vandewiele (Wuxi)
Lishui "Ninggui Lai" First Stop Apartment Project
High-concentration Anaerobic Tank Project for Shanghai Bioenergy Reutilization Project
Welding Fume Dust Removal System of Nanjing Daji Tower Manufacturing Co., Ltd.
Nanjing Eastern Agricultural Innovation Port Project
Steel Structure Engineering for the Construction of Urban Express Road Network in Zibo City